erp australia s.a.p. master data services
We provide specialized SAP Master Data Services and advice. With over 25 years MMS experience you can rely on our expertise and practical work methodologies to enhance your maintenance and, or project management.
Whilst working remotely or onsite we can provide a turnkey Master Data Package ready for project, facility or machinery start up.
ERP Australia is a wholey Australian owned registered family company with a combined experience of over 80 years in many industries.
Project experience
The Grosvenor Mine in Queensland's Bowen Basin is expected to produce 5 Mtpa of Metallurgical Coal from its underground longwall operation over 26 years.
The new Aquila Metallurgical Coal Mine extends the life of Anglo’s existing Capcoal underground operations by seven years, after the company’s nearby Grasstree mine reached its end of life in recent weeks.
Anglo’s Capcoal Handling & Processing Plant processes metallurgical steel making coal from their neighbouring Bowen Basin mines before loading onto trains to go to the export wharf.
TES is to improve the maintenance system by reducing the risk of fixed-plant reliability and availability, restricting the ability of the operation to deliver production, while reducing maintenance costs and working to improve budget forecasting.
BHP BILLITON;- TAILINGS DAM MONITORING SYSTEM IMPLEMENTAION→
Operation, surveillance, maintenance, effective monitoring and review practices must operate in line with TSF design requirements and be quality assured and controlled to ensure the TSF is functioning as intended.
The Grosvenor Mine in Queensland's Bowen Basin is expected to produce 5 Mtpa of Metallurgical Coal from its underground longwall operation over 26 years.
QGC, Queensland gas company yearly facility maintenance shutdowns within the Bowen and Surat Basins of Queensland→
Coal seam gas extraction within the Surat and Bowen Basins of Queensland, Australia forms the basis of the company's main operations.
The Ngujima-Yin FPSO is located within Production Licence WA-28-L in Commonwealth waters, approximately 43 km north of North West Cape, Western Australia. The water depth at the FPSO mooring location is approximately 340 m, with wells located in water depths up to 849 m.
ENI blacktip gas plant early gas export project before facility completion
The Blacktip gas field is located in exploration permit WA-279-P, a Western Australianadministered Commonwealth permit. It is a cooperative development between Woodside asOperator (53.85%) and Eni (46.15%).
adrail project→
The Adelaide–Darwin railway line is a railway line in Australia, between the South Australian town of Tarcoola and the Northern Territory city of Darwin. Preceded by a number of other shorter railways, a line through to Darwin was fully realised in 2004 when the final link from Alice Springs to Darwin was opened.
Challis Venture was installed in the "Challis"/"Cassini" Field in the Timor Sea, North West Australia and was successfully operating with the maximum production rate of approx. 60,000 bbl of crude oil per day.
fpso jabiru venture operational logistics→
The Jabiru oil field is located in the Timor Sea, approximately 650 km due west of Darwin. Cumulative production to August 2000 was about 100.2 million barrels (15.9 million cubic metres).
fpso buffalo venture repair & decommissioning→
The FPSO Buffalo Venture is a tanker converted FPSO with a SOFEC external turret mooring system. It operated on the Buffalo field in the Timor Sea, offshore Australia under Canadian Nexen Inc. following BHP Petroleum Australia. The field development consisted of a wellhead platform located in 30 m water depth producing to the FPSO, which was located in 255 m water depth.
The Griffin Development consists of the Griffin, Scindian and Chinook reservoirs. First oil was produced in 1994 and production ceased in 2009, with well abandonment undertaken in 2018.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Eget vel interdum sit a dolor vivamus. Lacus, in feugiat non neque mauris aliquet dolor vivamus.